Edge-Core ECS4610-24F Manual de Instruções Página 15

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 16
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 14
C
HAPTER
3
| Installing the Switch
Connecting to a Power Source
– 44 –
CONNECTING TO A POWER SOURCE
To connect a switch to a power source:
1. Insert the power cable plug directly into the AC socket located at the back of
the switch.
Figure 13: Power Socket
2. Plug the other end of the cable into a grounded, 3-pin, AC power source.
N
OTE
:
SFP transceivers are hot-swappable. The switch does not need to
be powered off before installing or removing a transceiver. However,
always first disconnect the network cable before removing a
transceiver.
N
OTE
:
SFP transceivers are not provided in the switch package.
MASTER CONTRACT: 176914 (LR 99150)
REPORT: 2296506
PROJECT: 2296506
_______________________________________________________________________________________
Vista de página 14
1 2 ... 10 11 12 13 14 15 16

Comentários a estes Manuais

Sem comentários